Construction Programme Management
The Complete Guide to Construction Management
★★★★★
$509.00 in stock
Udemy.com
as of October 22, 2026 3:50 am
The Most Essential Course for EVERY Construction Project!
Created by:
Hussain Najwani
Construction Project Manager
Construction Project Manager
Rating:4.54 (925reviews)
5220students enrolled
What Will I Learn?
- This course is helping construction projects save over 5 digits by applying the content provided!
- Download a copy of the "Course Manual" to use as a reference for your construction projects. The manual includes all steps and processes involved in a project summarized for you in 50 pages
- Understand construction contractual and financial models including the international form of agreement FIDIC, as well as payment processing methods, BOQ types, lump sum and provisional items, and more!
- Learn tender process including preparation of tender documents, floating the tenders, reviewing and analyzing the offers, and finally evaluating and awarding the contract to the selected bidder
- Understand architectural, structural, and MEP design systems by identifying the technical basis of every system, the main components, the rationale behind it, all with real-life examples
- Observe common construction management challenges and scenarios you may face such as claims and variations, accidents and incidents, contract termination, and many more real-life problems
- Learn about building material selection and options such as floor finishes, wall finishes, ceiling finishes, wooden works, metal works, glazing works, kitchens, sanitary, and more!
- Learn about construction value engineering method with examples of how to achieve great savings to your project
- Understand the parties involved in a project and their respective roles according to the procurement route (traditional, design and build, etc.)
Requirements
- No. The course will benefit both professionals and individuals new to construction.
- You don't need to be a professional in Construction to understand the course. The topics will be presented to you from the scratch to form a base and will then advance gradually ensuring all audience benefit and understand the content
Target audience
- Any person interested in the construction industry!
- Civil Engineers
- Architects
- Construction Clients
- Consultants
- Contractors
- Construction Professionals
- Project Managers
- All Construction workers (in all fields: authorities, clients, contractors, consultants, designers, etc.)


There are no reviews yet.